You are here: everRun User's Guide > Maintaining Physical Machines > Upgrading Both Physical Machines In a Running System

Upgrading Both Physical Machines In a Running System

Prerequisite: Before you upgrade to new physical machines,see Physical Machine Hardware Maintenance Restrictions.

To upgrade to new physical machines

  1. Upgrade everRun software if required to support the new PM. See the everRun Release Notes and the help on the everRunUpgrade Kits page of the everRun Availability Console
  2. Upgrade the first PM; see Replacing Physical Machines, Motherboards, NICs, or RAID Controllers.
  3. Repeat for the second PM. The everRun software then migrates the VMs to the other PM.
  4. If you added additional NIC ports, see Network Architecture Overview.

Related Topics

Maintenance Mode

Maintaining Physical Machines

The everRun Availability Console

Physical Machines and Virtual Machines

The Physical Machines Page

of